Wednesday, 9 March 2011

Thermal Characterisation Testing Completed



The thermal characterisation testing in vacuum has been successfully completed. The heater was bonded to the structure on 7th March, along with thermocouples to measure the temperature variation before and after the interface. The vacuum test was performed in ambient temperatures and has produced results which closely match predictions.

Tuesday, 1 March 2011

Thermal Characterisation Testing Scheduled

Scott Morgan and the platform team have been putting in a lot of work to prepare for Thermal Characterisation Testing of the cubesat hardware for the beginning of March. This testing is planned to commence on March 4th. A small vacuum chamber has been identified and the testing equipment is currently being sourced. The aim of the testing is to increase the knowledge of the thermal conductive coupling between one panel of the cubesat and another. This is very important for predicting the thermal gradients between the cubesat external panels facing the sun and those in shadow.

Tuesday, 1 February 2011

Communications team visit to Stevenage




Daniel Ludlow & Tim Mead from the Communications team have travelled up to Stevenage from Portsmouth for a day visit.
They have been carrying out a number of tasks:
- Transporting the cubesat hardware for platform testing in Stevenage
- Installation of the new computers and software in the Stevenage ground station
- Assessing the performance of the terminal node controller
- Comparing the ground station set-up in Stevenage to that in Portsmouth.
The computer installations have progressed well. "It was really useful to see the Stevenage ground station set-up and also to meet the Stevenage guys in person" says Daniel, Communications key area lead. The plan is to have near-identical set-ups in both ground stations to improve the ground station operation efficiency.

Wednesday, 27 January 2010

Problems with OBC startup issue resolved

A faulty power regulator is to blame for the recent problems had in starting up the on-board computer (OBC).


Matthew Ashworth and Andrew White travelled from Portsmouth to the Lunchsat lab in Stevenage to work alongside the OBC and Imager teams to identify the power regulator at the root of the problem. A replacement has now been ordered, alongside a new power surge protector and fixed voltage power supply, for installation next week -- when further testing will take place to ensure the problem is not being caused by other subsystems and that the new equipment minimises stress on the new regulator.

More satellite design work and testing hours will be required over February to ensure the project remains on schedule. Results of hardware testing are to be published in advance of the upcoming Review sessions, to be held with technical experts and senior management.

The OBC startup issue should be resolved by early February. The Mid-Term Review with technical experts is scheduled for early March; the End-of-Year Review with management is set to conclude progress mid-June.

Thursday, 31 January 2008

Can Do The Kessel Run In...

Neil Galbraith has taken the rotator controller kit ('LVB tracker') away to start building it this weekend hopefully.

However, if anyone else in the Portsmouth crew wants a shot at this, tools and soldering iron can be supplied, it should only take up one of your lunch hours.

There are actually 2 PCBs: a main board and a USB interface board. Almost all the parts are through-hole, so should be fairly easy to assemble to the PCB(s).

Any takers?